{"id":15712,"date":"2022-08-08T06:38:03","date_gmt":"2022-08-08T06:38:03","guid":{"rendered":"https:\/\/www.mup-group.com\/?p=15712"},"modified":"2022-08-08T06:38:03","modified_gmt":"2022-08-08T06:38:03","slug":"durchfuhrungskonzept-entsorgung","status":"publish","type":"post","link":"https:\/\/www.mup-water.com\/en\/durchfuhrungskonzept-entsorgung\/","title":{"rendered":"Implementation concept disposal"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"15712\" class=\"elementor elementor-15712\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-3047064 elementor-section-boxed elementor-section-height-default elementor-section-height-default wd-section-disabled\" data-id=\"3047064\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-1ec50f5\" data-id=\"1ec50f5\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-c579d3d elementor-widget elementor-widget-wd_text_block\" data-id=\"c579d3d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"wd_text_block.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-text-block reset-last-child text-left\">\n\t\t\t\n\t\t\t<p>In Bahnstadt in Heidelberg, a large pile of excavated material is stored in the area of construction site ED5. The heap is made up of excavated earth from various construction measures in the Bahnstadt in recent years and is now to be disposed of\/recycled in order to prepare the ED5 construction area for further development.\ud83d\ude9e<\/p><p>MuP Umwelttechnik has now prepared a so-called implementation concept for the client for sampling and disposal of the heap, including a rough cost estimate.\ud83d\ude86<\/p><p>The heap comprises approx. 20,000-24,000 m\u00b3 of soil material of quality level Z 2, whereby the previous declaration is based on very selective sampling and analyses. For disposal, further sampling, waste-legal analyses for the parameters of the VwV Boden Baden-W\u00fcrttemberg and the Deponieverordnung (DepV) and waste-legal classifications based on these are therefore necessary. The implementation concept for disposal therefore includes a sampling concept for the waste-legal declaration of the heap.<\/p><p>Construction site ED5, where the rubble is currently located, is in the west of the Bahnstadt planning area and is bordered to the south by the so-called Promenade, a cycle path and footpath, to the east by the future Eppelheimer Terrasse, an open space that is currently still fallow, and to the north and west by the tram tracks of Rhein-Neckar-Verkehr GmbH (RNV). Accordingly, access to the mound is difficult for trucks and the excavator required for the measure. In consultation with the RNV, various scenarios for the access route were elicited, whereby most of the level crossings that have already been provisionally created cannot be used because they are not designed for motor traffic.<\/p><p>In the implementation concept, various options for access with and without using the crossings over the tram line \ud83d\udea5 are discussed and recommendations are made. The decision as to which access and exit for sampling and disposal is favoured in further planning lies with the client.<\/p><p>Lastly, the costs <span style=\"font-size: 17.6px;color: var(--wd-text-color)\"> for the measure - as far as possible at the current planning stage - are estimated within the framework of a rough cost estimate. This includes both the costs for sampling and analysis, but also the costs \ud83d\udcb6 for disposal and transport as well as the construction of the site access road. Where possible, safety margins were also included, for example in the assumption for the waste classification of the soil and in the transport costs with regard to the current fuel price development.<\/span><\/p><p>\u00a0<\/p><p>#railway city 1TP5Waste law 1TP5Exploration #engineeringforabettertomorrow #mupgroup<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>A large pile of rubble is stored in the area of the ED5 construction site in the Bahnstadt district of Heidelberg. The pile consists of excavated earth<\/p>","protected":false},"author":125,"featured_media":15713,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20],"tags":[],"class_list":["post-15712","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.mup-water.com\/en\/wp-json\/wp\/v2\/posts\/15712","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mup-water.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mup-water.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mup-water.com\/en\/wp-json\/wp\/v2\/users\/125"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mup-water.com\/en\/wp-json\/wp\/v2\/comments?post=15712"}],"version-history":[{"count":0,"href":"https:\/\/www.mup-water.com\/en\/wp-json\/wp\/v2\/posts\/15712\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mup-water.com\/en\/wp-json\/wp\/v2\/media\/15713"}],"wp:attachment":[{"href":"https:\/\/www.mup-water.com\/en\/wp-json\/wp\/v2\/media?parent=15712"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mup-water.com\/en\/wp-json\/wp\/v2\/categories?post=15712"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mup-water.com\/en\/wp-json\/wp\/v2\/tags?post=15712"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}