ADD ANYTHING HERE OR JUST REMOVE IT...
M&P Water M&P Water
  • Home
  • About us
    • Philosophy
    • History
    • Management
    • Memberships
    • Software
    • Group
  • SIERA Alliance
  • Expertise
    • Hydrological models
    • Hydraulic models
    • Flood protection, heavy rain management
    • Dams, weirs, flood retention basins
    • Hydropower
    • Ecological hydraulic engineering
    • Building Information Modelling (BIM)
  • Projects
  • Locations
  • SOLUTIONS
  • Blog
  • Career
en_GB EN
en_GB EN de_DE DE
M&P Water
en_GB EN
en_GB EN de_DE DE
Menu
HomeEnvironment Environmental due diligence ("quick check") for a land development near Hamburg
Previous product
Projektentwicklung Gewerbepark - Zum Schleusenpark, Datteln
Project development commercial park - Zum Schleusenpark, Datteln
Back to products
Next product
Genehmigungsverfahren zur Kapazitätserweiterung einer Zinkhütte
Approval procedure for the capacity expansion of a zinc smelter

Environmental due diligence ("quick check") for a land development near Hamburg

Compare
Add to wishlist
  • Description
Description
  • Project description: In the context of a planned land acquisition of a former industrial site, the site-related framework conditions were to be examined.
  • Our services: Preparation of a desktop study ("quick check") to examine the site-related framework conditions with regard to planning law, geotechnics, contaminated sites, explosive ordnance, nature conservation and species protection, supply and disposal, traffic and noise; advising the client with regard to necessary further investigations (building pollutant investigation, subsoil and contaminated site investigation, species protection potential analysis and mapping, drainage concept); coordination of the necessary expert opinions via the corresponding specialist departments of the M&P Group and external subcontractors.
  • Duration: 2021 - 2022
  • Industry of the client: Real estate developer in the logistics industry

Ähnliche Projekte

Compare
Quick view
Add to wishlist
Close

Approval procedure for the capacity expansion of a zinc smelter

Environment
Compare
Quick view
Add to wishlist
Close

Prime Computer AG

Environment
Compare
Quick view
Add to wishlist
Close

Project development commercial park - Zum Schleusenpark, Datteln

Environment
Business areas

Hydrological models
Hydraulic models
Flood protection, heavy rain management
Dams, weirs, flood retention basins
Hydropower
Ecological hydraulic engineering
Building Information Modelling (BIM)

SIERA Members

M&P Engineering Company
TABERG Engineers
seecon engineers
Tucher Engineers GmbH
M&P Climate

Prof. Burmeier Engineering Company
Dürselen Real Estate
M&P Environmental Technology 
M&P Energy 
ICP Ingenieurgesellschaft Prof. Czurda und Partner mbH

Contact

M&P Water
South street 15
99867 Gotha
Germany

Tel.: +49 261 9423172-0
E-mail: water@mup-group.com

Facebook Instagram X-twitter
Imprint | Privacy Policy
Imprint | Privacy Policy
  • Home
  • About us
    • Philosophy
    • History
    • Management
    • Memberships
    • Software
    • Group
  • SIERA Alliance
  • Expertise
    • Hydrological models
    • Hydraulic models
    • Flood protection, heavy rain management
    • Dams, weirs, flood retention basins
    • Hydropower
    • Ecological hydraulic engineering
    • Building Information Modelling (BIM)
  • Projects
  • Locations
  • SOLUTIONS
  • Blog
  • Career