ADD ANYTHING HERE OR JUST REMOVE IT...
M&P Water M&P Water
  • Home
  • About us
    • Philosophy
    • History
    • Management
    • Memberships
    • Software
    • Group
  • SIERA Allianz
  • Expertise
    • Hydrological models
    • Hydraulic models
    • Flood protection, heavy rain management
    • Dams, weirs, flood retention basins
    • Hydropower
    • Ecological hydraulic engineering
    • Building Information Modelling (BIM)
  • Projects
  • Locations
  • SOLUTIONS
  • Blog
  • Career
en_GB EN
en_GB EN de_DE DE
M&P Water
en_GB EN
en_GB EN de_DE DE
Menu
HomeDams Volkenbacher Weiher dam Expert opinion on the stability of the dam structure
Previous product
Planungs- und Beratungsleistung zur wasserbaulichen Umsetzung der Wassereinleitung in den Tagebau
Planning and consulting services for the hydraulic engineering implementation of the water discharge into the opencast mine
Back to products
Next product
Hochwasserschutz- und Starkregenkonzept für den METRO Standort der Goodman GmbH in Marl
Flood protection and heavy rain concept for the METRO site of Goodman GmbH in Marl

Volkenbacher Weiher dam Expert opinion on the stability of the dam structure

Compare
Add to wishlist
  • Description
Description

Dam Volkenbach Weiher Expert opinion on the stability of the barrier structure

 

Client Zoo Rheinböllen GmbH

Hochwildschutzpark 1, 55494 Rheinböllen

Performance period 2023 - today
Project Tierpark Rheinböllen GmbH (TPR) is the operator and responsible for the maintenance of the Volkenbacher Weiher dam. Following a water inspection with the Lower Water Authority, Tierpark Rheinböllen GmbH was requested to submit a stability report for the dam of the Volkenbacher Weiher dam. Furthermore, the current condition of the dam is to be documented. Among other things, the operating company is also planning to further develop the use of the existing shore areas in the form of recreational areas and the implementation of further measures to optimise the future operation of the zoo. M&P Water GmbH also offers planning and consulting services for this purpose. TPR's goal is to be able to operate the zoo as sustainably and self-sufficiently as possible, which is why a conversion of the wastewater disposal and energy supply systems in particular is planned for the medium term.
Engineering services
  • Geotechnical investigations, sampling, laboratory tests, determination of soil properties and dam construction, surveying
  • Geotechnical verifications
  • Plant inspection with photo documentation, basic evaluation
  • Assessment of the effect of the woody structures on stability
  • Verification of stability, summary report
  • Planning services for the design of the shore areas
  • Consulting services for the sustainable operation of the zoo (wastewater disposal, water and energy supply)

Ähnliche Projekte

Compare
Quick view
Add to wishlist
Close

HWSB Klietznick dike, km 37.0 - 38.865

Flood retention basins, Dams, Weirs
Business areas

Hydrological models
Hydraulic models
Flood protection, heavy rain management
Dams, weirs, flood retention basins
Hydropower
Ecological hydraulic engineering
Building Information Modelling (BIM)

SIERA Members

M&P Group
M&P Engineering Company
TABERG Engineers
seecon engineers
Tucher Engineers GmbH
M&P Climate

Prof. Burmeier Engineering Company
Dürselen Real Estate
M&P Environmental Technology 
M&P Energy 
ICP Ingenieurgesellschaft Prof. Czurda und Partner mbH

Contact

M&P Water
South street 15
99867 Gotha
Germany

Tel.: +49 261 9423172-0
E-mail: water@mup-group.com

Facebook Instagram X-twitter
Imprint | Privacy Policy
Imprint | Privacy Policy
  • Home
  • About us
    • Philosophy
    • History
    • Management
    • Memberships
    • Software
    • Group
  • SIERA Allianz
  • Expertise
    • Hydrological models
    • Hydraulic models
    • Flood protection, heavy rain management
    • Dams, weirs, flood retention basins
    • Hydropower
    • Ecological hydraulic engineering
    • Building Information Modelling (BIM)
  • Projects
  • Locations
  • SOLUTIONS
  • Blog
  • Career