Office and laboratory building B1, berlinbiotechpark - excavation planning
| Client | Argolon GmbH
Draschwitzer Hauptstraße 11, 06729 Elsteraue |
| Performance period | 2023 - today |
| Project | According to the "Update of the subsoil expertise" for the present project, the excavation pit is to be water to be protected. As the bottom of the excavation pit is ~ 3.85 m below the highest expected groundwater level, the excavation pit must be made watertight. |
| Engineering services |
|