ADD ANYTHING HERE OR JUST REMOVE IT...
M&P Water M&P Water
  • Home
  • About us
    • Philosophy
    • History
    • Management
    • Memberships
    • Software
    • Group
  • SIERA Allianz
  • Expertise
    • Hydrological models
    • Hydraulic models
    • Flood protection, heavy rain management
    • Dams, weirs, flood retention basins
    • Hydropower
    • Ecological hydraulic engineering
    • Building Information Modelling (BIM)
  • Projects
  • Locations
  • SOLUTIONS
  • Blog
  • Career
en_GB EN
en_GB EN de_DE DE
M&P Water
en_GB EN
en_GB EN de_DE DE
Menu
HomeEnvironment Approval procedure for the capacity expansion of a zinc smelter
Previous product
Environmental Due Diligence („Quick-Check“) für eine Flächenentwicklung bei Hamburg
Environmental due diligence ("quick check") for a land development near Hamburg
Back to products
Next product
Fachgutachten zur Rheindammertüchtigung
Expert opinion on the strengthening of the Rhine dams

Approval procedure for the capacity expansion of a zinc smelter

Compare
Add to wishlist
  • Description
Description
  • Project description: The operators of the zinc smelter planned to increase the production capacity of the plant. As part of the increase in production capacity, modifications and additional equipment were to be added. The aim was not to increase the emissions emanating from the plant in the process. The planned expansion required a permit according to the Federal Immission Control Act (BImSchG) including an environmental impact assessment according to the Environmental Impact Assessment Act (UVPG).
  • Our services: Coordination of the required authority procedures, preparation of a scoping document for the environmental impact assessment (EIA), monitoring of the scoping procedure and preparation of the environmental impact assessment report, preparation of the application documents for selected chapters of the BImSchG application, integration of the construction application and compilation and finalisation of the application documents for the complete BImSchG application as well as preparation of an initial status report (preliminary assessment and phase 1).
  • Duration: 2017 - 2019
  • Branch of the customer: Industry / Pipe material processing

Ähnliche Projekte

Compare
Quick view
Add to wishlist
Close

Asphericon GmbH

Environment
Compare
Quick view
Add to wishlist
Close

CEMA AG

Environment
Compare
Quick view
Add to wishlist
Close

Prime Computer AG

Environment
Business areas

Hydrological models
Hydraulic models
Flood protection, heavy rain management
Dams, weirs, flood retention basins
Hydropower
Ecological hydraulic engineering
Building Information Modelling (BIM)

SIERA Members

M&P Group
M&P Engineering Company
TABERG Engineers
seecon engineers
Tucher Engineers GmbH
M&P Climate

Prof. Burmeier Engineering Company
Dürselen Real Estate
M&P Environmental Technology 
M&P Energy 
ICP Ingenieurgesellschaft Prof. Czurda und Partner mbH

Contact

M&P Water
South street 15
99867 Gotha
Germany

Tel.: +49 261 9423172-0
E-mail: water@mup-group.com

Facebook Instagram X-twitter
Imprint | Privacy Policy
Imprint | Privacy Policy
  • Home
  • About us
    • Philosophy
    • History
    • Management
    • Memberships
    • Software
    • Group
  • SIERA Allianz
  • Expertise
    • Hydrological models
    • Hydraulic models
    • Flood protection, heavy rain management
    • Dams, weirs, flood retention basins
    • Hydropower
    • Ecological hydraulic engineering
    • Building Information Modelling (BIM)
  • Projects
  • Locations
  • SOLUTIONS
  • Blog
  • Career