ADD ANYTHING HERE OR JUST REMOVE IT...
M&P Water M&P Water
  • Home
  • About us
    • Philosophy
    • History
    • Management
    • Memberships
    • Software
    • Group
  • SIERA Allianz
  • Expertise
    • Hydrological models
    • Hydraulic models
    • Flood protection, heavy rain management
    • Dams, weirs, flood retention basins
    • Hydropower
    • Ecological hydraulic engineering
    • Building Information Modelling (BIM)
  • Projects
  • Locations
  • SOLUTIONS
  • Blog
  • Career
en_GB EN
en_GB EN de_DE DE
M&P Water
en_GB EN
en_GB EN de_DE DE
Menu
HomeFlood protection Framework contract for hydraulic engineering projects
Previous product
Büro- und Laborgebäude B1, berlinbiotechpark - Baugrubenplanung
Office and laboratory building B1, berlinbiotechpark - excavation planning
Back to products
Next product
BV Rückbau Märkisches Zentrum Berlin
BV Deconstruction Märkisches Zentrum Berlin

Framework contract for hydraulic engineering projects

Compare
Add to wishlist
  • Description
Description

Framework contract for hydraulic engineering projects

 

Client seecon Engineers GmbH

Spinnereistraße 7, Hall 14 (staircase B), 04179 Leipzig

Performance period 2023 - today
Project Associated project list under framework agreement;

01 Elbe dike Prester

02 Dike Construction Polder Uckermark

03 Jetties on the Saale

04 Renaturation of the Geesgraben

05 Jetties on the Bode

06 Barrage target Bargischow South

07 Wildwood barriers Polenz

08 MDB Port of Science

09 VOF Lot 2 Zwenkau

10 HWS Altenbach

11 Dyke Göbitz

12 HWS Plötzkau

13 HWS Schweinitz

14 Planning/monitoring helmets

15 HWSB Dike Markwerben

16 Dike Schützberg

17 Wing dyke Tiefensee

18 Bennewitz jetty

Engineering services
  • Project planning of civil engineering structures
  • Structural engineering
  • Environmental impact study, extensive mapping services, species protection assessment
  • FFH and SPA impact assessment
  • Landscape conservation plan
  • Ecological construction monitoring, etc.

Ähnliche Projekte

Compare
Quick view
Add to wishlist
Close

Flood protection and heavy rain concept for the METRO site of Goodman GmbH in Marl

Flood protection, Heavy rain management
Compare
Quick view
Add to wishlist
Close

Consultancy for the conceptual planning of the river channelisation of the Tumbes River

Flood protection, Heavy rain management
Compare
Quick view
Add to wishlist
Close

Planning and consulting services for the hydraulic engineering implementation of the water discharge into the opencast mine

Flood protection, Heavy rain management
Business areas

Hydrological models
Hydraulic models
Flood protection, heavy rain management
Dams, weirs, flood retention basins
Hydropower
Ecological hydraulic engineering
Building Information Modelling (BIM)

SIERA Members

M&P Group
M&P Engineering Company
TABERG Engineers
seecon engineers
Tucher Engineers GmbH
M&P Climate

Prof. Burmeier Engineering Company
Dürselen Real Estate
M&P Environmental Technology 
M&P Energy 
ICP Ingenieurgesellschaft Prof. Czurda und Partner mbH

Contact

M&P Water
South street 15
99867 Gotha
Germany

Tel.: +49 261 9423172-0
E-mail: water@mup-group.com

Facebook Instagram X-twitter
Imprint | Privacy Policy
Imprint | Privacy Policy
  • Home
  • About us
    • Philosophy
    • History
    • Management
    • Memberships
    • Software
    • Group
  • SIERA Allianz
  • Expertise
    • Hydrological models
    • Hydraulic models
    • Flood protection, heavy rain management
    • Dams, weirs, flood retention basins
    • Hydropower
    • Ecological hydraulic engineering
    • Building Information Modelling (BIM)
  • Projects
  • Locations
  • SOLUTIONS
  • Blog
  • Career