ADD ANYTHING HERE OR JUST REMOVE IT...
M&P Water M&P Water
  • Home
  • About us
    • Philosophy
    • History
    • Management
    • Memberships
    • Software
    • Group
  • SIERA Allianz
  • Expertise
    • Hydrological models
    • Hydraulic models
    • Flood protection, heavy rain management
    • Dams, weirs, flood retention basins
    • Hydropower
    • Ecological hydraulic engineering
    • Building Information Modelling (BIM)
  • Projects
  • Locations
  • SOLUTIONS
  • Blog
  • Career
en_GB EN
en_GB EN de_DE DE
M&P Water
en_GB EN
en_GB EN de_DE DE
Menu
HomeSoil Extension, new construction and conversion measures, Wunstorf airfield
Previous product
Versmannkai Ost, Baufeldfreimachung BF 102-110
Versmannkai East, site clearance BF 102-110
Back to products
Next product
Eigenüberwachung Deponie Castrop-Rauxel
Self-monitoring of Castrop-Rauxel landfill

Extension, new construction and conversion measures, Wunstorf airfield

Compare
Add to wishlist
  • Description
Description

Period: Since 2012

Field of activity: Historical investigation of explosive ordnance,

Technical construction management and local construction supervision for explosive ordnance disposal in accordance with the German Ordinance on Explosive Ordnance Disposal (Ordinance on Explosive Ordnance Disposal).

Construction guidelines for explosive ordnance disposal

Scope of services:

  • Creation of a historical-genetic reconstruction
  • Planning services
  • Preparation of clearance concepts, consulting services
  • Participation in construction meetings
  • Coordination/control of explosive ordnance clearance
  • Preparation of work/safety plans
  • Preparation of tender documents, assistance in awarding contracts
  • Cost/invoice control
  • Local construction supervision

Short description: With the planned stationing of the Airbus A 400 M transport aircraft at the Wunstorf military airfield in the area of responsibility of the State Construction Management of Lower Saxony, an adaptation of the infrastructure is necessary. For this purpose, extensive expansion, new construction and conversion measures have been carried out on the existing building and technical stock or are still being implemented. Due to its previous use in World War II as a Wehrmacht airbase, the site is classified as contaminated with explosive ordnance. History has shown that the area was hit in the course of bombing raids. The main cause is the burial of explosive ordnance. Therefore, explosive ordnance clearance is required for construction work involving ground intervention. Computer-aided area soundings, borehole soundings, explosive ordnance clearance during construction or at specific points and the use of a separation system are used. Since 2012, M&P has been responsible for the necessary technical construction management and local construction supervision of the explosive ordnance clearance.

Ähnliche Projekte

Compare
Quick view
Add to wishlist
Close

Conversion of the former BW Hospital Rostrup, Bad Zwischenahn

Soil
Compare
Quick view
Add to wishlist
Close

Historical exploration of the former Kurhessen barracks, Hann. Münden

Soil
Compare
Quick view
Add to wishlist
Close

Orienting investigation (Phase IIa) of the Bad Arolsen site shooting range, Bad Arolsen

Soil
Business areas

Hydrological models
Hydraulic models
Flood protection, heavy rain management
Dams, weirs, flood retention basins
Hydropower
Ecological hydraulic engineering
Building Information Modelling (BIM)

SIERA Members

M&P Group
M&P Engineering Company
TABERG Engineers
seecon engineers
Tucher Engineers GmbH
M&P Climate

Prof. Burmeier Engineering Company
Dürselen Real Estate
M&P Environmental Technology 
M&P Energy 
ICP Ingenieurgesellschaft Prof. Czurda und Partner mbH

Contact

M&P Water
South street 15
99867 Gotha
Germany

Tel.: +49 261 9423172-0
E-mail: water@mup-group.com

Facebook Instagram X-twitter
Imprint | Privacy Policy
Imprint | Privacy Policy
  • Home
  • About us
    • Philosophy
    • History
    • Management
    • Memberships
    • Software
    • Group
  • SIERA Allianz
  • Expertise
    • Hydrological models
    • Hydraulic models
    • Flood protection, heavy rain management
    • Dams, weirs, flood retention basins
    • Hydropower
    • Ecological hydraulic engineering
    • Building Information Modelling (BIM)
  • Projects
  • Locations
  • SOLUTIONS
  • Blog
  • Career